388 George St, Sydney
Whale Beach Home
Gunyah, Dubbo
Bower Street, Manly
Wellington Street, Bondi
Little Manly House
Charles St, Parramatta
Trilogy House
Macquarie Square
The Village Preschool
Port Douglas Estate, QLD
Neutral Bay House
PAMS Newman, WA
Level 33, Wollongong
William Inglis, $140M
Baaka Cultural Centre
Parramatta Square
Wylandra, Mareeba
Dhupuma Barker School
Vodafone TPG HQ
Bingo Recycling SSD
Bullinah AHS, Ballina
The Iconic, Waterloo
Centuria Data Centre
Kaltukatjara Aged Care
Cherbourg Health Clinic
Pittwater House School
40 Chard Rd Childcare
388 George Street
A new urban pavilion at King and George Streets reconnected a workplace tower to the city. Stellen helped Multiplex close the flood conditions so the ground plane and end-of-trip facilities could open on time.
Background
388 George Street is a new urban pavilion on one of Sydney's key civic corners. It adapts the old King George Tower (originally John Andrews) by stripping back an intrusive podium, restoring a diagonal public arcade, and putting a proper entrance back onto George Street.
Street retail, a basement food market, a rooftop bar and end-of-trip facilities under the tower are the activation story. That only works if people can use the ground plane and the below-ground amenities with confidence, and if Multiplex can hand the staged packages over without City of Sydney flood conditions still open.
What was at stake
- The architecture is about street life and workplace amenity. Flood sign-off sat on the critical path to occupation of the retail and end-of-trip works.
- Handover was staged. SP2 and SP3 needed clear, independent confirmation rather than a single late certificate that held everything up.
- Retail tenancies needed flexibility (including a lower slab for future finishes) without leaving a hole in the flood story.
- End-of-trip users needed the lift to behave safely if water reached the basement, including when the building is on backup power.
What it unlocked
- Staged verification with Multiplex so each handover package could close cleanly.
- Independent confirmation that the installed flood protection matched the consent, including the end-of-trip lift response and the ground-floor levels that keep retail dry.
- A practical path for Retail 5: temporary protection at the access points so the tenancy could still take its preferred floor finish later.
- Condition 52 closed for Multiplex. The pavilion and amenities could open as the architect intended: active street, working tower, people moving through the arcade and below-ground facilities without flood paperwork still hanging over occupation.
Opening a CBD ground plane and need the flood path closed before handover? Get in touch
Whale Beach Home
A permanent home high above the Northern Beaches, designed for long-time holidaymakers who wanted the relaxed coastal character without the compromise. Stellen kept the stormwater and civil work quiet enough for the architecture to stay the main event.
Background
Whale Beach sits on a steep, dual-fronted site with four layered levels: a formal entry from the upper street, a casual beachside entry below, everyday living for the couple above and independent accommodation for adult children below. Off-form concrete, weathered timber and stone do the heavy lifting; light, courtyards and elevated gardens pull the landscape in.
The architecture is about place, privacy and a house that can change with the family. On a Northern Beaches escarpment that only works if roof, terrace and landscape drainage leave outdoor rooms dry and council satisfied, without turning the lot into a tank farm.
What was at stake
- Steep coastal catchments and limited lawful discharge points on a thin, dual-fronted lot.
- Outdoor living, thresholds and gardens that had to feel open, not engineered.
- A construction sequence that could not wait for drainage bolted on after the architectural set was locked.
What it unlocked
- Stormwater and civil resolved with the architectural set, not after it.
- A clear path through Northern Beaches and AS3500 without oversized pits in the living spaces.
- Outdoor rooms and beachside circulation that stay dry in design storms, so the house can do what Lockyer intended: practical, poetic coastal living.
Designing a coastal house and need drainage that stays out of the way? Get in touch
Gunyah, Dubbo Northwest
The first stage of a multi-thousand-lot community at Dubbo Northwest. Stellen set Stage 1 civil so homes and roads could start without locking the precinct into large detention basins from day one.
Background
Dubbo Northwest is a greenfields community of about 5,000 lots at full build-out. Gunyah is Stage 1: roads, drainage, earthworks and services that have to open the first lots while the masterplan keeps moving.
Greenfields estates often pay twice for drainage: once to get Stage 1 approved, then again when early detention sterilises later yield or forces a rebuild of trunk systems. The job was a precinct stormwater story council could maintain, and a Stage 1 package that still worked for what came next.
What was at stake
- Stage 1 detention that could burn later yield or force trunk drainage rebuilds.
- Dubbo Regional Council needing a lawful, maintainable stormwater path across the whole precinct, not a one-lot fix.
- Zone 1 construction certificate delivery while the masterplan was still evolving.
What it unlocked
- Precinct stormwater strategy accepted without Stage 1 OSD basins.
- Stage 1 civil advanced into construction documentation on a path that still works for later stages.
- Zone 1 delivery continuing without the estate painting itself into a drainage corner.
Opening a multi-stage estate and want Stage 1 drainage that does not sterilise later lots? Get in touch
7 Bower Street, Manly
Holocene House is a climate-positive Manly home canopied in plants, with water moving through like a rainforest creek and every room opening outdoors. Stellen carried stormwater from DA to occupation so the environmental ambition stayed buildable.
Background
Holocene House is the first Australian home certified by the international Active House Alliance, and later Grand Designs Australia House of the Year. The owners set a clear bar: generate more energy by 2050 than was used to create and run the house, including materials, construction and eventual disposal.
Rainwater, greywater, a chemical-free pool with biofilter, native planting and reused excavation all sit inside that story. The architecture wants the house to feel like being in nature. The drainage still has to meet Northern Beaches rules without becoming the main character.
What was at stake
- A climate-positive brief that fails if stormwater is bolted on as an afterthought.
- DA needed a clear drainage story without freezing innovation during build.
- Construction detail, site support and independent checking so installation matched the intent through to occupation.
What it unlocked
- DA stormwater accepted against Northern Beaches on-site requirements and AS3500.3, with room left to refine in construction.
- CC drawings, condition close-out and quality path through occupation.
- A finished home where water, plants and outdoor living work together, not a house fighting its own drainage.
Building a high-performance house and need stormwater that keeps up with the ambition? Get in touch
79-103 Wellington Street, Bondi Beach
A multi-residential scheme on Wellington Street for a prolific Eastern Suburbs builder-developer. Stellen proved the through-site overland flow could be managed so neighbours stayed protected and the ground plane stayed workable.
Background
Stargate builds places people are proud to come home to across Bondi and the Eastern Suburbs. At 79-103 Wellington Street, PBD Architects shaped a multi-res scheme on a site with a through-site overland flow path under Waverley flood and stormwater controls.
In Bondi, flood impact on adjoining properties can stop a scheme as effectively as a height non-compliance. The architecture and yield only matter if the flow story holds.
What was at stake
- Depths, velocities and hazard in the 1% AEP without a major building redesign.
- No increased flood risk to neighbours while still giving the scheme a usable ground plane.
- A flood and stormwater path that would survive DA and revised CC, not just a concept sketch.
What it unlocked
- No increased flood risk to surrounds and minimal 1% AEP impact.
- Safe refuge above flood planning level retained in the design.
- DA and CC support with PBD's footprint intact, so Stargate could keep delivering homes people want to live in.
Multi-res on a flow path and need the neighbour impact story locked down? Get in touch
31 Stuart Street, Little Manly
Overland flow that used to cut the site became a perimeter landscape rivulet. Stellen and CHROFI turned a flood constraint into part of how the house meets the ground.
Background
31 Stuart Street is a residential site in the Little Manly Beach catchment. Upstream overland flow and a failing 450 mm pipe bisected the lot and threatened the elevated living platform the architecture wanted.
The easy response is tanks, pits and a house that turns its back on the flow path. The better response is to move the water to the edge, plant it, and let the architecture keep an elevated, universal living platform.
What was at stake
- A natural flow path cutting diagonally across the site in significant rain.
- Protecting elevated living without burying the house in drainage hardware.
- Replacing failing infrastructure and still leaving a landscape feature, not a drain scar.
What it unlocked
- Flow redirected to a perimeter landscape of native plants and a rivulet.
- 1% AEP channel and diversion accepted for DA.
- A flood constraint converted into an architectural and landscape asset that supports the CHROFI design, rather than fighting it.
Got overland flow cutting your site and want it to become landscape, not a scar? Get in touch
5-7 Charles Street, Parramatta
A 50-storey residential tower in a high-flood-risk Parramatta catchment. Stellen kept people safe, basements dry, and found an alternative flood-door approach that saved about a million dollars.
Background
Parramatta CBD is growing up, and the floodplain does not care about the skyline. At 5-7 Charles Street a high-rise residential tower had to carry basement parking, plant and people through a high-flood-risk catchment with warning, evacuation and physical protection that council would register and the building could actually operate.
Standard barrier packages on towers like this blow out cost and programme. The delivery team needed flood response that was buildable through design and construction, not a gold-plated door schedule that nobody wanted to own.
What was at stake
- Basement protection cost that could quietly erase project margin.
- A warning and evacuation system council would register and residents could use.
- Construction-phase flood doors and civil details coordinated with architecture and structure on a live tower programme.
What it unlocked
- Alternative flood door specification that saved approximately $1M versus the originally specified barriers.
- Two-stage FloodSmart-registered warning and evacuation designed for the tower.
- Stormwater and flood documentation that stayed buildable through delivery, so the tower could open without the basement still being a flood question mark.
High-rise on a floodplain and need basement protection that does not blow the budget? Get in touch
Trilogy House
On the edge of Pittwater, a house begun by Peter Muller and extended by Glenn Murcutt received another careful chapter. Stellen revised the stormwater story so alterations could proceed under a modified CC without drowning the heritage logic.
Background
Trilogy House sits on a steep slope looking north up Pittwater. Designed by Peter Muller in the early 1960s and added to by Glenn Murcutt in the 1990s, the pedigree was already daunting. After meeting Muller, the clients and Peter Stutchbury Architecture chose to contribute another chapter rather than overwrite the book.
The work is about waste, energy, recycling and a responsible addition to a significant house. On Northern Beaches controls, even a careful heritage alteration still needs a stormwater path that council will accept for a modified construction certificate.
What was at stake
- Builder sketches and tank relocation that could break the architectural drainage logic if handled clumsily.
- A modified CC timetable, not a greenfield DA with months of slack.
- A lean package: what council needed for approval, not a padded hydraulic set on a heritage house.
What it unlocked
- Revised stormwater management plan issued for modified CC submission.
- Rainwater tank relocation and builder comments folded into one coordinated set.
- Supporting drawings ready for Northern Beaches assessment so the next chapter of Trilogy could be built, not stuck in paperwork.
Altering a significant house and need stormwater that respects the existing fabric? Get in touch
Macquarie Park / Macquarie Square
A billion-dollar-scale Macquarie Park precinct where the assumed flood footprint was driving basements and ground planes. Stellen cut that footprint by about 30% and opened design space across multiple buildings.
Background
Macquarie Park is one of Sydney's major commercial and mixed-use precincts. With John Holland and Turner, precinct works sat in a constrained overland flow environment where council's assumed flood extent was shaping basement layout, ground plane and public domain before the real flow behaviour was fully tested.
On a multi-building site, one conservative flood line multiplies into lost basement yield, awkward ground floors and public domain that never quite works. The cost is not just modelling. It is everything the wrong footprint prevents.
What was at stake
- A precinct-scale flood assumption larger than the real flow behaviour.
- Multiple buildings and basements depending on one defensible overland flow model.
- Neighbour impacts that had to stay acceptable while engineering compliance stayed tied to the approved assessment.
What it unlocked
- About 30% smaller flood footprint than council assumed.
- Basement and ground-level design opportunities unlocked across the precinct.
- Compliance certificates confirming civil works met the approved flood assessment, so delivery could proceed on the better geometry.
Precinct flood assumptions choking your basements and ground plane? Get in touch
The Village Preschool, 27 Kintore Street
A weatherboard cottage adapted into an inspiring local preschool, with creative spaces behind a conserved street facade. Stellen helped get a hidden council pipe out of the way of that community story at the planning panel.
Background
The Village Preschool keeps a single-storey gabled weatherboard face to the street and opens into a double-height rear volume nestled in the garden. Inside, timber rafters, lining boards and the original brick chimney teach children about scale, materials, shape and light. NSW Architecture Awards recognised the educational architecture; the Marrickville Medal gave a commendation.
Late in the DA, a council stormwater pipe showed up running from Beach Road under the cottage to Kintore Street. Marrickville DCP controls resist building over drainage lines. The architecture and the operator's community brief were ready. The pipe was not.
What was at stake
- An unknown council asset roughly bisecting a community preschool site.
- DCP rules about surface access for renewals, not just day-to-day maintenance.
- A solution that worked for the architecture and for council asset management, then had to be explained to a planning panel.
What it unlocked
- Clear options: retain versus divert, with maintenance and buildability front and centre.
- Supporting report for council engineers and the planning panel.
- Panel attendance and follow-up so the stormwater story was told by engineers, and the preschool could open as a place for kids, not a pipe problem.
Community project stuck on a council pipe and need someone to stand it up at panel? Get in touch
Port Douglas Estate, Craiglie
A 104-lot greenfields estate at Craiglie where the lots only work if Andreassen Road, the Captain Cook Highway interface and drainage to Mowbray River all move together. Stellen took the civil story from concept through operational works.
Background
Port Douglas Estate is a residential greenfields project for Vermont / Port Douglas Estate at Craiglie. Two packages had to advance as one: internal subdivision (first 25 lots to operational works, masterplan for the remaining ~79) and external works on Andreassen Road off Captain Cook Highway.
Far North Queensland estates live or die on trunk interfaces. Major overland flow crosses the highway and continues east along Andreassen Road. Without a TMR-acceptable drainage story and a lawful path to Mowbray River, Stage 1 lots stay on paper.
What was at stake
- Highway drainage impact and diversion options around a new intersection and roundabout.
- Detention and bioretention sized for the real catchment, not a bare QUDM minimum that fails later.
- External trunk water and sewer plus internal Stage 1 lots, without one package stalling the other.
What it unlocked
- Full civil package through concept, OPW design and operational works reporting.
- Intersection and roundabout geometry coordinated with traffic engineering; 1% AEP drainage to a lawful discharge.
- External trunk services and internal Stage 1 lots designed for council approval with construction-phase support, so the estate could start selling more than a brochure.
Greenfields estate with a highway interface and need civil that unlocks Stage 1 lots? Get in touch
Neutral Bay House
A harbour-side renovation where the architecture leads and the drainage stays in its place. Stellen took stormwater from a lean DA through construction detail and occupation close-out.
Background
Neutral Bay mixes steep catchments, old drainage easements and design-led renovations that cannot afford a heavy-handed tank farm. Luigi Rosselli's work is humanist and material-led. The civil job is to reuse what works, upgrade only what must change, and keep the construction set tight.
Harbour suburbs punish over-documentation at DA and under-documentation at build. The path that works is bare-minimum approval flexibility, then the right detail when the builder needs it.
What was at stake
- Document only what DA needs so the approval stays flexible.
- Add roof drainage and construction detail later without rewriting the approved concept.
- Work around existing easements and connection points rather than inventing a new system for its own sake.
What it unlocked
- DA stormwater package focused on collection, disposal and detention only where required.
- Construction drawings with roof drainage and condition responses for a tight build contract.
- Site verification and occupation certificate support when the system was installed, so the house could finish cleanly.
Harbour renovation and need stormwater that stays flexible from DA to OC? Get in touch
Puntukurnu Aboriginal Medical Service, Newman
The first primary healthcare hub of any type built in Newman, serving Martu communities up to 800 km away. Stellen made rainwater part of the architecture: captured on site and reused by gravity, no pumps.
Background
The PAMS Healthcare Hub in Newman is a rammed-earth health facility for Puntukurnu Aboriginal Medical Service, serving the East Pilbara and remote communities including Kunawarritji, Punmu, Parnngurr and Jigalong. Newman sits 1,200 km north of Perth in country the size of Japan.
Intense but infrequent Pilbara rain, arid ground and a design that wants water in the landscape, not hidden in tanks and pumps. The win is a clinic where the water story supports Country and gardens without mechanical complexity.
What was at stake
- Capture roof and site water and reuse it all on site for native gardens.
- Do it by gravity in a remote arid town, without a pump-heavy scheme that fails when service is hard.
- Keep civil and stormwater aligned with Kaunitz Yeung rammed-earth architecture and community ownership.
What it unlocked
- All rainwater captured and reused on site by gravity.
- Irrigation of native gardens without pumps as a permanent operating story.
- An award-winning remote health hub where water, architecture and community sit in the same design.
Working on something with similar stakes? Get in touch
Baaka Cultural Centre, Wilcannia
Wilcannia is the cultural heart of Western NSW on the Baaka (Darling) River. Stellen designed stormwater retention as landscape, so a new cultural centre could host exhibitions, performance and community life in a semi-arid place with thin council services.
Background
Wilcannia sits about 965 km west of Sydney where the Barrier Highway crosses the Baaka. Annual rainfall is around 255 mm. The Baaka Cultural Centre is for public exhibitions, performances and community events on Country.
In a place like this, detention as ugly infrastructure fights the architecture. Retention as a landscape feature becomes part of how the centre meets the ground.
What was at stake
- Arid climate and limited council stormwater infrastructure.
- A culturally significant public building that cannot look like a drain yard.
- Civil that supports events and everyday community use without chronic site wetness or dust bowls.
What it unlocked
- On-site rainwater retention integrated as landscape, not a bolted-on tank farm.
- Civil and stormwater package that let the centre open for culture and community.
- A public place on the riverbank that works with the climate instead of pretending it is Sydney.
Working on something with similar stakes? Get in touch
Dhupuma Barker School, Nhulunbuy
A flagship school upgrade on Yolngu Country where significant overland flows cut the site. Stellen redesigned earthworks, grading and stormwater so the school could expand without living in a flood path.
Background
Dhupuma Barker School at Nhulunbuy is a major education upgrade for Gamatj Aboriginal Corporation in North East Arnhem Land. Remote construction, wet season intensity and a site in the path of overland flow all arrive at once.
The architecture and school programme only work if kids and teachers are not negotiating floodwater. Civil had to resolve risk and still be buildable a long way from Darwin.
What was at stake
- Significant overland flows across a school site in a remote wet-season climate.
- Earthworks, pavement and disposal that a remote crew can actually build.
- Protect upgraded facilities without sterilising the campus layout.
What it unlocked
- Flood risk reduced through earthworks, site grading and stormwater design.
- Civil package suited to remote construction realities.
- A school campus that can grow without the flow path still owning the ground.
Working on something with similar stakes? Get in touch
Bullinah Aboriginal Health Service, Ballina
A new Aboriginal health hub on Grant and Tamar Streets in Ballina. Stellen delivered civil, stormwater, hydraulics and road widening so the clinic could sit properly in the town street network.
Background
Bullinah Aboriginal Health Service needed a contemporary healthcare hub in Ballina, designed with Kaunitz Yeung Architecture. The site spans Grant Street and Tamar Street and needed more than a building: drainage, internal services and road edges that work for patients and staff.
Coastal regional towns mix flood context, older street geometry and community health buildings that have to feel welcoming, not engineered.
What was at stake
- Stormwater and civil coordination across a multi-lot urban health site.
- Road widening on Tamar Street and Holden Lane without breaking access.
- Internal hydraulics and erosion control that match construction reality.
What it unlocked
- Full civil, stormwater and hydraulic package issued through design.
- Road widening and site drainage integrated with the health hub layout.
- A clinic path that is buildable in Ballina, not just approved on paper.
Working on something with similar stakes? Get in touch
Kaltukatjara Aged Care, NT
Aged care in a remote NT community with no formal stormwater network. Stellen designed retention basins and spillways so the facility protects itself and improves outcomes for the surrounding settlement.
Background
Kaltukatjara (Docker River) is remote even by NT standards. There is no conventional pit-and-pipe town drainage to connect to. An aged care facility still has to shed water safely in the wet and stay usable in the dry.
The civil answer is retention on site, controlled overflow to an existing track, and a scheme the community can live with long after the builders leave.
What was at stake
- No existing formal stormwater infrastructure.
- Protect vulnerable residents without exporting uncontrolled flow into the settlement.
- Simple, maintainable basins rather than complex mechanical systems.
What it unlocked
- Two retention basins sized for the 10-year storm with controlled spillways.
- Exceedance directed to an existing unsealed track in a planned way.
- Better stormwater outcomes for the facility and the surrounding community.
Working on something with similar stakes? Get in touch
40 Chard Road Childcare, Brookvale
A multi-storey childcare oasis lifted above Brookvale industrial ground plane, beside a natural watercourse. Stellen modelled the overland flow path so safe floor levels and drainage unlocked DA.
Background
Paisley Park at 40 Chard Road redefines commercial childcare by lifting children out of an industrialised setting, with outdoor space stacked level by level. The site sits next to a natural creek and an irregular overland flow path.
Council flood concern is real next to a watercourse. Without a clear flow model and freeboard story, the learning oasis stays a concept.
What was at stake
- Complex overland flow beside a natural creek on an irregular lot.
- Safe floor levels and freeboard for each design storm.
- Roof water and overland flow managed without killing the stacked outdoor programme.
What it unlocked
- Flood flows modelled across the site with clear safe levels.
- Stormwater system for roof and overland flow accepted for DA.
- Childcare that can open next to the creek with the risk path closed.
Working on something with similar stakes? Get in touch
Level 33, Gipps and Flinders Streets
State Significant Development for five mixed-use buildings and 1,260 apartments on the Fairy Creek floodplain. Stellen rebuilt the flood model so the SSD package could prove no material off-site impact.
Background
73-77 Gipps Street and 60-74 Flinders Street is a major Wollongong mixed-use SSD on the Fairy / Cabbage Tree Creek floodplain: five buildings, two basements, 1,260 apartments.
On a floodplain SSD, the model is the permission structure. If off-site impact is wrong, yield and basements do not matter.
What was at stake
- Council TUFLOW model that needed rebuilding around the real scheme.
- No material off-site impact in design flood events.
- PMF refuge, access paths and a retained culvert corridor that still work for 1,260 homes.
What it unlocked
- SSD flood and civil package issued with rebuilt modelling.
- No material off-site impact demonstrated for design floods.
- PMF refuge and access defined so the apartment precinct can proceed on the floodplain.
Working on something with similar stakes? Get in touch
William Inglis Stable Relocation, Warwick Farm
Complete stormwater and rainwater systems for a $140 million equestrian hotel and event centre on low-lying land near the Georges River, through design and construction close-out.
Background
William Inglis relocated major stabling and event facilities to Warwick Farm on flood-prone land near the Georges River. Horses, events and hospitality do not tolerate chronic wetness or dirty discharges to the river.
The civil package had to collect, convey and treat water across a large precinct, then stay true through construction RFIs and as-builts.
What was at stake
- Low-lying flood-prone land next to the Georges River.
- Full stormwater and rainwater system for stabling, hotel and events.
- Construction-phase review, inspections and as-built verification.
What it unlocked
- Complete collection, conveyance and disposal system designed and delivered.
- Gross pollutant traps at river outlets protecting the Georges River interface.
- Construction close-out so a $140M equestrian precinct could open dry and compliant.
Working on something with similar stakes? Get in touch
3, 4 and 6 Parramatta Square
Construction-phase stormwater on a $2 billion Parramatta landmark. Working with the plumbing contractor, Stellen reconfigured OSD and removed about $100,000 of water-quality devices by proving alternative compliance.
Background
Parramatta Square is one of Western Sydney defining civic and commercial precincts. During construction, detention and treatment details still move. The wrong answer is to install every device on the drawing because nobody wants to reopen the conversation.
The right answer is to rethink detention with the people installing it, keep council requirements, and stop spending on treatment that is not actually required.
What was at stake
- Construction-phase OSD that was costing time and money.
- Water quality devices that could be eliminated with a defensible alternative.
- Keep council compliance while improving build efficiency.
What it unlocked
- About $100,000 saved by eliminating unnecessary water-quality devices.
- OSD reconfigured with the plumbing contractor for a cleaner install.
- Compliance held on a $2B landmark without construction theatre.
Working on something with similar stakes? Get in touch
Wylandra Subdivision, Mareeba
A 300-400 lot Mareeba estate unlocked with a stormwater masterplan and TUFLOW proof that catchment impact at Chinaman Creek stayed neutral or better.
Background
Wylandra is a staged residential estate at Mareeba with hundreds of lots at ultimate yield and a first operational works stage of 14 lots. Far North Queensland councils will veto staged delivery if the catchment story is weak.
Detention and culvert options had to be proven before Stage 1 could honestly proceed.
What was at stake
- Catchment impact at Chinaman Creek / Ray Road under council scrutiny.
- Staged DA/OPW without a late catchment veto.
- Detention and culvert upgrades optioneered to real hydrology, not hope.
What it unlocked
- Stormwater masterplan and TUFLOW 2D modelling for the estate.
- Neutral/beneficial catchment impact demonstrated.
- Stage 1 path open without painting later stages into a drainage corner.
Working on something with similar stakes? Get in touch
63 Waterloo Road, Macquarie Park
Civil, trunk drainage and 2D overland flow for Vodafone TPG Macquarie Park headquarters. Modelling verified neighbour impacts and became the basis for engineering compliance certificates after construction.
Background
63 Waterloo Road is a corporate headquarters in Macquarie Park commercial core. Trunk road drainage and overland flow sit under the same pressure as any large commercial floorplate: neighbours, council and a building that has to open on time.
The approved assessment only matters if it survives construction and becomes the compliance certificate basis.
What was at stake
- Overland flow and trunk drainage next to commercial neighbours.
- 2D modelling that proves acceptable off-site impacts.
- A path from approved assessment to engineering compliance certificates.
What it unlocked
- Detailed 2D hydraulic modelling and catchment reanalysis accepted.
- Neighbour impacts verified as acceptable.
- Engineering compliance certificates issued against the approved flood assessment after construction.
Working on something with similar stakes? Get in touch
Bingo Bins Resource Recovery, St Marys
SSD stormwater for one of NSW most advanced resource recovery facilities. Stellen cut about $200,000 in treatment cost and freed 200 m2 of operational floor space while meeting EPA consent conditions.
Background
Bingo resource recovery facility needed State Significant Development approval with real EPA stormwater conditions. On a waste facility, floor space is money and treatment trains can sprawl if nobody challenges the default package.
Quantity, quality, bioretention, filters and rainwater reuse had to work as one system that operators can live with.
What was at stake
- SSD and EPA consent conditions on a major waste facility.
- Treatment cost and footprint eating operational floor space.
- MUSIC-modelled quality and quantity that still leave a working plant.
What it unlocked
- SSD stormwater path secured with EPA conditions met.
- About $200,000 treatment cost saved and 200 m2 floor space freed.
- A resource recovery facility that can run without drowning in stormwater hardware.
Working on something with similar stakes? Get in touch
The Iconic, 830 Elizabeth Street
Mixed-use retail and residential behind retained heritage perimeter walls. Stellen redesigned stormwater to stop chronic water ingress without cutting the heritage structure to pieces.
Background
830 Elizabeth Street keeps existing heritage perimeter walls and slabs while supporting mixed-use retail and residential. Heritage fabric and modern occupation collide when water keeps finding its way in.
The job is full compliance with Sydney Water OSD requirements without invasive pipe cutting through structure you are trying to keep.
What was at stake
- Chronic water ingress in a retained heritage shell.
- Minimise invasive works through existing fabric.
- OSD compliance for a mixed-use Waterloo site.
What it unlocked
- Comprehensive stormwater redesign verified with DRAINS modelling.
- Ingress path fixed without unnecessary cutting of heritage structure.
- A mixed-use building that can trade and live dry inside the walls it kept.
Working on something with similar stakes? Get in touch
Centuria Data Centre, Newton Road
Data centre due diligence at Wetherill Park where sensitive plant needed PMF floor levels without heavy barriers or pointless detention. Stellen confirmed the flood-risk path and that Fairfield industrial policy did not require OSD.
Background
Data centres care about water in a different way to apartments. Sensitive plant wants PMF protection. Industrial policy in Fairfield does not always demand the detention package people assume.
Early civil clarity stops the project buying barriers and tanks it does not need.
What was at stake
- Sensitive plant floor levels above the PMF.
- Avoid unnecessary barrier packages and detention.
- Clear Low Flood Risk commercial/industrial DCP compliance.
What it unlocked
- PMF fill islands and undercroft strategy for plant protection.
- No on-site detention required under Fairfield industrial policy.
- A data centre path that spends money on resilience, not ritual OSD.
Working on something with similar stakes? Get in touch
Cherbourg Regional Aboriginal and Islander Health Clinic
A Commonwealth-funded clinic extension where recurring stormwater problems were disrupting care. Stellen intercepted upstream flows, cut groundwater ingress and protected the building so the clinic could keep treating people.
Background
Cherbourg regional Aboriginal and Islander health clinic needed an extension and a drainage reset. Recurring flooding and wet building fabric are not a maintenance annoyance in a clinic. They stop care.
Upstream catchment flows, groundwater and cavity protection had to be solved together with hydraulics for the new works.
What was at stake
- Chronic flooding affecting clinic operations.
- Upstream flows and groundwater entering the building zone.
- Hydraulic services for the extension without repeating the same failure.
What it unlocked
- Pit and pipe system intercepting upstream catchment flows.
- Subsoil and cavity drains protecting the building.
- A clinic extension that can operate without water still winning.
Working on something with similar stakes? Get in touch
The Pittwater House Schools, Collaroy
Stage 1A civil for a Northern Beaches school: kiss-and-drop geometry, pavement and WSUD rain gardens that closed DA conditions including a TfNSW-coordinated section 138 path.
Background
Pittwater House at South Creek Road, Collaroy needed Stage 1A access and drainage that parents, buses and council could all live with. Kiss-and-drop is where school DA conditions go to die if geometry is sloppy.
Rain gardens and swales had to carry WSUD while the driveway still worked at peak drop-off.
What was at stake
- DA conditions on driveway geometry, pavement, kerb and median.
- Transport for NSW coordinated section 138 requirements.
- WSUD rain gardens and swales integrated with a working kiss-and-drop.
What it unlocked
- Kiss-and-drop and road design that satisfied DA conditions.
- Section 138 path coordinated for the access works.
- WSUD integrated so the school can expand without traffic and drainage still open.